VDOT T92 – BEAVERDAM, VA - SITE CULVERT PIPE REPLACEMENT
START DATE:
August 2016
COMPLETION DATE:
November 2016
FINAL CONTRACT AMOUNT:
$351,392.58
CONTRACTOR:
Virginia Department of Transportation
RISKS:
- The special risks were to the environment. We were staging and working inside the creek and siltation as well as potential fuel and or oil contamination was not acceptable
HOW WE OVERCAME, ORCHESTRATED OUTCOME:
We built a special non erodible coffer dam that would let the water flow through in high water condition but would trap the turbidity and contaminates in during working conditions