LUTRON BUILDING EXPANSION - GOOCHLAND, VA - SITE IMPROVEMENTS FOR EXPANSION
START DATE:
September 2015
COMPLETION DATE:
January 2016
FINAL CONTRACT AMOUNT:
$207,473,31
CONTRACTOR:
M.L. Bell Construction
RISKS:
- Occupied Manufacturing Facility.
- We encountered elevation issues with the storm system which caused for a re-design and modifications to existing infrastructure.
- The existing foundations were discovered to not be sufficient to support the new loading dock
HOW WE OVERCAME, ORCHESTRATED OUTCOME:
- We created a new temporary gravel parking lot to accommodate staff parking as well as construction Vehicle.
- We worked closely with the design team to redesign and implement the storm pipe and structures to accommodate the new loading dock needs.
- We hired a structural engineer to design the storing and underpinning of the existing foundation at the new loading dock.